K
Originally published by Kenyans
📰 Read Full Article
top
July 9, 2026
1h ago

KeRRA Reveals Mistake That Has Led to Damage to Ngong-Suswa Road

KeRRA Reveals Mistake That Has Led to Damage to Ngong-Suswa Road

The deteriorating 60-kilometre road has forced motorists to slow down significantly and weave across lanes to avoid the potholes, raising safety concerns...

✨ Key Highlights

The Kenya Rural Roads Authority (KeRRA) has identified overloaded commercial trucks as the primary cause of damage to the 60-kilometre Ngong-Suswa Road.

  • The road, built at a cost of Ksh3.9 billion, was designed for a maximum axle load of 10 tonnes but is being used by trucks carrying up to 50 tonnes.
  • KeRRA, the authority responsible for rural roads, is implementing measures including a virtual weighbridge to enforce compliance.
  • Motorists have expressed concerns over the road's condition despite significant investment, with severe potholes causing safety hazards.

Continue Reading

Read the complete article from Kenyans

📰 Read Full Article
Advertisement
Advertisement